We have a new 2DMOT chamber

We’ve made some major progress this week with the assembly, pump-down, and bake out of the new 2DMOT chamber for 6Li and 7Li.

There are no indications of leaks so far with the blanked-off chamber baking at 250 C.  If things still look good tomorrow, we’ll we’ll heat most of the chamber (especially the appendages that will house the lithium vapor sources) to >400 C to drive hydrogen out of the chamber walls.

Temperature Stability Issues Resolved

The temperature in the central part of our lab is now stable to within ±0.05 C.Temp. 09_25_2014 thru 10_02_2014

It’s been a complicated and needlesly drawn out technical battle to get to this point. For comparison, here’s a plot of what the HVAC system was doing to the lab temperature shortly after it was commissioned, over a year ago. (Emerson/Liebert, you are permanently blacklisted as far as we’re concerned)

TempHumid Sept 16-24

Needless to say it wasn’t easy to make progress getting the lasers stabilized in an environment like that. Now that we’ve got a proper laboratory to work in, we should be able to make a lot more progress in the next 12 months!