Optical Table Installation

Moving day finally came, and with it, a crane.arrival 

First, the unloading of the crate with the new table.

crane1  forklift1

The new table sitting out in front of the physics building.

front window delivery

The new lab, marked out with table locations

Empty Room

There were 7 old tables to be moved: 5 on the 3rd floor, 2 in the basement

old tables

Getting ready to fly the tables

first table out

craning

One of the two 12 ft tables that wasn’t salvageable (rusted out), on its way out.

flying table

Uncrating the new table and getting it centered in the straps.

Lifting Big Table

The guy driving the forklift did a pretty credible job threading a 1600 lb table through the window

through the window

Those Genie lifts were creaking pretty badly.

two genie lifts

Lowering the table to the floor.

lowering

Getting all of the tables in position.

positioning

DONE! Time to level them, float them, and start doing science?

final tables