Spring 2004:

Design review

Summer/Fall 2004:

Fabrication

Fall 2004:

Detector calibration

Dec. 2004/Jan. 2005:

Integration at NASA Wallops flight facility

Feb. 2005:

Buildup at Poker Flat

Feb 27 – Mar. 15 2005:

2005 launch window